Description

Since the beginning of 2011 we have sent hundreds of flatpack units to our business partner in Columbia. The units varied from offices, accommodations, sanitary units to mess and kitchen, the sizes of which were also varying from 10', 20' to 24'. They have been put into different fields, such as mining and oil fields, military use and municipal areas.
Now we will introduce the sanitary and office units used for a Columbia refinery which were supposed to accommodate more than 100 persons.

In this project, the main insulation material used is mineral wool, and the wall panels of the units were 100mm thick. All the electrical components were certificated with UL, and some of the main ones were internationally certificated. All the doors and windows adopted were from quality brands across China.
Here we could see that there were some new ideas about modular building : the materials of our flatpack package such as the iron sheets have been utilized and made into book shelves, folders and desk partitions, which was simple but practical and exceptional.
Description
We could also find that the internal layout of these units were really flexible as the client was able to partition the certain space they want just using some screen partition panels.
In addition, the doorsteps and overroofs in this project are another two points worthwhile to mention. Generally speaking, our units should be raised up 30 to 50mm from the ground on factory site, in which the door steps are not necessary; however, when it comes to muddy grounds in rainy areas, water proofing should be considered into prefabrication, and doorsteps seem obviously important if the units are raised high as they are the entrances into the units. And the overroofs are really helpful for units used in the rainy areas as they can discharge the rainwater effectively and protect the units' roof well