FIVE FEATURES
Easy Transportation
Efficient Transportation
- Sea Freight
The Ark cabin structure when flat packed for transportation is designed in accordance with a standard ISO shipping container. The corner casting structure enables lifting capability utilizing a crane in the same manner as a standard ISO shipping container.
- On Site Transportation
The dimensions of the forklift pockets on the cabin structure is 85mm* 260mm which enables forklift capability on site.
- Road Freight
Due to the structure being the same dimensions as a standard ISO shipping container road freight is efficient and easy to handle the cargo.
Fast Construction
Fast Construction
- Turn-key solution due to all components being flat packed, including the roof structure, floor, wall panels, doors, windows and interior decoration.
- Up to 40% time saving on construction over convention building techniques due to all structural elements being prefabricated.
- Construction of a single cabin can be undertaken with only two skilled workers.
Flexible Combination
Flexible Combination
- The ARK cabins can be assembled and then disassembled for re transportation via road, train or sea.
- Individual cabins can be linked together to form larger structures at ease through the Ark Smart linking kit.
- Internal wall panels can be removed and changed at the clients’ discretion to provide flexible layout options.
Cost Saving
Cost Saving
- Transportation costs are reduced by up to 75% cost compared with Traditional Architecture or modified containers.
- Construction time is reduced by up to 40% saving time and money.
- The ability to change internal layouts or relocate structures provides cost savings.
Green & Sustainable
Sustainability
- Mineral wool which is used primarily for insulation in the structures can be recycled
- The structure of the cabin is made from steel and once the client has no further use of the structure the steel can be recycled
- Ark’s manufacturing facilities are energy efficient with strict governance on wastage of materials and water supply.
News& Events
Nov. 04, 2011
“Take off the suit and put on the sportswear “On October 22nd and 23rd, all the ARK staff went for an outward bound training.Refer to Wikipedia, Outward Bound's founding mission was to give young seamen the ability to survive...
Nov. 04, 2011
Last week it's been a hot week on KOMO site, which has pushed the overoofing work of the last senior blocks. Our builders on site are building two single-level Senior Blocks with overroofs, one is 7 units a row in two...
Sep. 13, 2011
By far there have been nearly 500 ARK units used for EXXON'S PNG LNG Project on KOMO site.The single level 84-unit Office Area has been being trimmed out in last two weeks with the huge over roofs on. Even though there were...
Quick Links
- Product Videos
- Locations
- Documents
- +86 21 60838082
